Out of Sight, Out of Time
A 10-year grace period for complying with an EPA regulation mandating that all underground storage tanks have spill, overfill and corrosion protection runs out on December 22, 1998. Hundreds...

Pump-and-Treat Rescue
The pump-and-treat method of remediation has been regarded for years as unsuccessful and untrustworthy. But a recent project in Chicago showed that in conjunction with horizontal wells...

Civil Engineering in the Asia Region
Asian Infrastructure, Sustainable Development and Project Management
This proceedings, Civil Engineering in the Asia Region: Asian Infrastructure, Sustainable Development and Project Management, contains papers...

The San Francisco Connection
An underground switchyard and storage facility for San Francisco's Municipal Railway challenged the limits of both cut-and-cover and tunneling in loose soil. The project was...

The Invisible Infrastructure
Most developed countries have 50- to 100-year-old underground utility systems that carry far greater loads than their designs. They're difficult to repair or replace, yet...

Big Digs Around the World
This proceedings, Big Digs Around the World, consists of papers presented at sessions sponsored by the Geo-Institute of ASCE held in conjunction...

Engineering History and Heritage
This proceedings Engineering History and Heritage, contains papers presented at the Second National Congress on Civil Engineering History and...

Containing the Cold War's Hot Waste
A new method for the construction, verification, and maintenance of underground vaults isolates and contains radioactive burial sites without excavation or drilling in contaminated areas....

Saving a Sinking City
A construction team repairing a bridge or expanding a hospital usually must work around the daily activities of the affected group of people. But for a construction project in Co-op City,...

A Signature Bridge for Boston (Available only in Structural Engineering Special Issue)
The first hybrid steel and concrete span in America will debut over the Charles River in Boston, carrying ten lanes of interstate traffic and serving as an elegant capstone to the largest...

Geotechnical Baseline Reports of Underground Construction
Guidelines and Practices
For many years, several forms of interpretive geotechnical reports have been incorporated into the Contract Documents for underground construction projects. Based on recent feedback obtained...

Boston's Central Artery/Tunnel Project: Challenging Problems, Innovative Solutions
Boston's Central Artery/Tunnel (CA/T) Project is the largest, most complex highway project ever undertaken in the United States. Conceived a quarter centrury ago, the project...

Construction Congress V
Managing Engineered Construction in Expanding Global Markets
This proceedings contains over 130 papers presented at ASCE's Construction Congress V held in Minneapolis, Minnesota, October 5-7, 1997. This publication is divided into seven...

Stabilizing the Stacks
Spenser White and Prentis designed a hybrid soil nailing system to ensure that a historic library on the Bryn Mawr, Pennsylvania, campus would not be damaged during adjacent construction...

Turnback Project Moves Ahead
The $202 million Muni Metro Turnback (MMT) Project, scheduled for completion in September 1996, includes an 840 ft section consisting of twin steel-lined tunnels that connects to the Embarcadero...

Telling Florida's Water Story
The latest addition to the nation's family of aquariums is Tampa's recently completed Florida Aquarium. The $84 million 152,000 square foot cast-in-place concrete...

Containing Spills and Fire
A $95 million project to consolidate five jet fuel supply facilities that serve Los Angeles International Airport is nearing completion. The project shows how codes for wastewater-treatment...

Hydroelectric Pumped Storage Technology
International Experience
This Committee report, Hydroelectric Pumped Storage Technology: International Experience, was prepared by the Task Committee on Pumped Storage,...

Impact of Sedimentation Caused by Runoff
As water is pumped into a reservoir, sedimentation caused by runoff can be an important factor in the reservoir's storage capacity. This report discusses various studies conducted...

Annual Delivery Decisions in the Simulation of the California State Water Project and Federal Central Valley Project using DWRSIM
This paper presents a new annual contractor delivery determination procedure for the California Department of Water Resources' State Water Project (SWP) and Central Valley...

 

 

 

 

Return to search